Header menu link for other important links
X

Optimized Inventory Control on Construction Materials by Application of E-Technology Transfer along JIT

Vardhana B.H,
Published in ASTM International
2019
Volume: 47
   
Issue: 6
Abstract

Most of the construction projects in India experience ineffective inventory control because of the application of the conventional method. This conventional procurement management method is commonly practiced (more than 95 % of the time), which encourages improper utilization of resources in construction industries. Material procurement is a financially operated arena that requires technology transfer rather than common techniques. Construction stakeholders are generally unaware of E-Technology development. Recent E-Technology commerce networking and communication has been drastically improved and thus can be effectively utilized to produce uninterrupted supply chain management in construction procurement systems; additionally, this technological transfer system in construction industries can improve the profit margins and can avoid time overrun of construction projects. © 2019 by ASTM International.

About the journal
JournalData powered by TypesetJournal of Testing and Evaluation
PublisherData powered by TypesetASTM International
ISSN0090-3973
Impact FactorNo
Open AccessNo
Citation Styleunsrt